skip to main
|
skip to sidebar
ash's srt251 blog
Monday, June 2, 2008
base of prop
concrete was not cut to size
corner join showing cleats
residential tilt up building during construction showing props, cleats and openings for windows
this is the glazing to structure connection at the Melbourne Exhibition centre, it came in handy when doing my major project.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2008
(14)
▼
June
(8)
No title
base of prop
concrete was not cut to size
No title
corner join showing cleats
residential tilt up building during construction s...
No title
this is the glazing to structure connection at the...
►
May
(1)
►
April
(2)
►
March
(3)
About Me
SRT251 Ashleigh hussein
View my complete profile